Change management

Kotter's 8-step change model, step by step

John Kotter's model is a sequence for leaders: eight things to do, in order, to move a whole organisation from an old way of working to a new one.

Updated

Change management

Kotter, a Harvard Business School professor, first described the eight steps in a 1995 Harvard Business Review article about why change efforts fail, then in his 1996 book Leading Change. His argument was that most failed changes skip a step, usually an early one.

In one lineBuild the case and the team first, remove what blocks people, show early results, and do not declare victory until the new way is normal.

The 8 steps, with a software rollout as the example

The example running through the steps: a manufacturer replacing an old order system with a new ERP across six sites.

  1. Create a sense of urgencyShow why staying put is the bigger risk. The old order system loses support next year, and orders are already keyed twice.
  2. Build a guiding coalitionPut together a group with enough authority and trust to lead it. Not only IT: a plant manager, a finance lead, a respected planner.
  3. Form a vision and strategySay where you are going in a sentence people can repeat. "One order, entered once, visible to every site."
  4. Communicate the visionSay it often, in every channel, and act in line with it. If leaders keep asking for the old reports, nobody believes the new system matters.
  5. Remove barriersClear whatever stops people acting on the vision. Often that is a rule or a manager. Just as often it is that people cannot use the new screens yet.
  6. Generate short-term winsPlan results people can see within weeks. The first site goes live and ships a full day of orders without a single phone call to support.
  7. Sustain accelerationUse the credibility from early wins to tackle the harder parts. Roll out to the next sites and fix what the first one taught you.
  8. Anchor the change in the cultureMake it "how we do things here". New starters learn only the new process, and the old system is switched off.

The wording above follows Kotter's later versions. The 1996 originals read a little differently, for example "empower broad-based action" for step 5 and "consolidate gains and produce more change" for step 7. The meaning is the same.

Where training fits in Kotter's model

Training matters most at steps 5 and 6. Not being able to do the task in the new system is a barrier like any other, and usually the most common one on go-live day. And an early win is much easier to produce when the first team has already practised.

That is why change teams give people a safe place to rehearse before the switch: a sandbox, a coached session, or a practice simulation of the real screens. A scored run at the end tells you who is ready, which makes a good early win to report.

The 2014 update: eight accelerators

In his 2014 book Accelerate, Kotter revised the model for faster-moving organisations. The eight steps became eight "accelerators" with three changes worth knowing:

  • The steps can run at the same time, not strictly one after another.
  • The small guiding coalition is joined by a large "volunteer army" drawn from all levels.
  • The change network works alongside the normal management hierarchy, not through it.

Kotter's change model vs Lewin's

Kurt Lewin's model, from the 1940s, has three stages: unfreeze, change, refreeze. Kotter's eight steps are often read as a more detailed version of the same arc.

LewinKotterWhat is happening
UnfreezeSteps 1 to 4People accept that the old way has to go.
ChangeSteps 5 to 7People start working the new way.
RefreezeStep 8The new way becomes the normal way.

Lewin gives you a way of thinking about change. Kotter gives leaders a to-do list. Neither tells you what an individual employee needs, which is the job of the ADKAR model.

Where Kotter's model falls short

  • It is top-down. The steps are written for senior leaders. People on the receiving end barely appear.
  • It reads as a straight line. Real changes loop back. The 2014 update admits this.
  • It says little about skills. "Remove barriers" covers a lot of ground, and the model does not say how to get thousands of people competent in a new tool.

Key takeaways

  • Kotter's 8 steps are for the people leading a change across an organisation.
  • Most failures come from rushing the first four steps.
  • Step 5, removing barriers, includes making sure people can actually use the new system.
  • Pair it with ADKAR to cover what each individual needs.

Questions people ask

What are Kotter's 8 steps?
Create a sense of urgency, build a guiding coalition, form a vision and strategy, communicate the vision, remove barriers, generate short-term wins, sustain acceleration, and anchor the change in the culture.
Which book is Kotter's 8-step model from?
Leading Change, published in 1996. It grew out of Kotter's 1995 Harvard Business Review article, Leading Change: Why Transformation Efforts Fail. He updated the model in Accelerate in 2014.
What is the difference between Kotter's and Lewin's change models?
Lewin describes change in three broad stages: unfreeze, change and refreeze. Kotter breaks the same journey into eight concrete steps for leaders. Kotter's steps 1 to 4 line up with unfreeze, 5 to 7 with change, and 8 with refreeze.
How is Kotter's model different from ADKAR?
Kotter's model is about what leaders do to move a whole organisation. ADKAR is about what one person needs in order to change. They are often used together.
Is Kotter's model still used?
Yes. It remains one of the most taught change models, especially for large programmes such as system rollouts and reorganisations. Many teams now run the steps in parallel, as Kotter's 2014 update suggests.

Keep reading

Last reviewed 19 November 2026. Recourse publishes these guides for learning, customer education and change teams. Details drawn from public sources can change.